HAFED DELHI WAZIRPUR: Hafed/EE(HQ)/A-I/743 Dated 28-04-2022 FOR RENOVATION AND ESURRECTION OF ELECTRICAL INSTALLATION LIKE REPLACING OF OLD TRANSFORMER OF 250 KVA WITH NEW TRANSFORMER OF 800 KVA, INSTALLATION OF NEW ISOLATOR PANEL, DISTRIBUTION PANEL FOR EACH FLOOR, CAPACITOR PANEL OF 400KVAR, PCC PANEL, 2 NOS. OF ACB, CURRENT TRANSFORMER, POTENTIAL TRANSFORMER, BUS BARS, CABLES, MINIATURE CIRCUIT BREAKERS ETC AND OTHER MISCELLANEOUS REQUIRED FOR NEW DISTRIBUTION OF ELECTRICAL LOAD AT HAFED COMPLEX, WAZIRPUR DEPOT. NEW DELHI
HAFED GRUGRAM WAREHOUSE : HAFED/EE(HQ)/A-I/1604 Dated 19-09-2022 FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 1000 KVA TRANSFORMER BY REPLACING OLD 500 KVA TRANSFORMER INCLUDING INSTALLATION OF NEW VACUUM CIRCUIT BREAKER (VCB), POWER CONTROL CENTRE (PCC) PANEL, AUTOMATIC POWER FACTOR CORRECTION (APFC) PANEL AND OTHER ELECTRICAL INSTALLATION ITEMS AT EXISTING SUBSTATION AT HAFED WAREHOUSING COMPLEX, GURUGRAM
Taigna Electronic city Greater Noida: Civil works of 33 kV Substation Project at TEGNA EMC, Ecotech-VI, Greater Noida.
Aditya world city: Eternal Electrification works 15 MVA Transformer installations, street light pole works, cable laying, LT panel Installation.